A modular fixture is easier to modify should there be any last minute design changes
A dedicated fixture could take 8-10 weeks to design and deliver which could impact production schedules (modular fixturing can usually be shipped from stock).
The tooling can all be reused for a completely new design (i.e. when this model of bus is taken out of production |